Please use this identifier to cite or link to this item: http://cmuir.cmu.ac.th/jspui/handle/6653943832/57248
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIsara Buaphanen_US
dc.contributor.authorSuttichai Premrudeepreechacharnen_US
dc.date.accessioned2018-09-05T03:37:18Z-
dc.date.available2018-09-05T03:37:18Z-
dc.date.issued2017-08-07en_US
dc.identifier.other2-s2.0-85030158092en_US
dc.identifier.other10.1109/IYCE.2017.8003740en_US
dc.identifier.urihttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85030158092&origin=inwarden_US
dc.identifier.urihttp://cmuir.cmu.ac.th/jspui/handle/6653943832/57248-
dc.description.abstract© 2017 IEEE. This research studies fault diagnosis about an unmanned 8 MW bulb turbine generator of run of river hydro power plant locate far from control and maintenance center by expert system scheme. To assist the inexpert maintenance crews to solve the failure by collecting knowledge from power plant equipment data, maintenance instruction manual, maintenance standard, historical failure events, and body of knowledge from expertise. Translate these information to knowledge base of an expert system by propositional logic. Together with failure analysis of mechanical and electrical equipment that initiate lockout relay signal to shutdown the power plant by fault tree analysis technique for more accuracy and correctness of fault diagnosis. Establishing an inference engine that comprise of failure search rules and problem solving rules. Developing graphical user interface that similar to the SCADA graphic of operator station making inexpert maintenance crews to familiar with the expert system software and easy to use. These will speed up the inexpert maintenance crews to correct the problem as fast as the expertise does. For example, such a case that the generator cannot synchronize to the grid that took the inexpert maintenance crews about 43 hours to correct the problem which lost income about 1,036,080 THB. With the help of the expert system the inexpert maintenance crews could take less than 4 hours to correct this problem and could save loss about 900,000 THB.en_US
dc.subjectEnergyen_US
dc.subjectEngineeringen_US
dc.titleDevelopment of expert system for fault diagnosis of an 8-MW bulb turbine downstream irrigation hydro power planten_US
dc.typeConference Proceedingen_US
article.title.sourcetitle2017 6th International Youth Conference on Energy, IYCE 2017en_US
article.stream.affiliationsChiang Mai Universityen_US
Appears in Collections:CMUL: Journal Articles

Files in This Item:
There are no files associated with this item.


Items in CMUIR are protected by copyright, with all rights reserved, unless otherwise indicated.