Please use this identifier to cite or link to this item: http://cmuir.cmu.ac.th/jspui/handle/6653943832/59542
Full metadata record
DC FieldValueLanguage
dc.contributor.authorC. Kongnamen_US
dc.contributor.authorS. Nuchprayoonen_US
dc.contributor.authorS. Premrudeepreechacharnen_US
dc.contributor.authorS. Uatrongjiten_US
dc.date.accessioned2018-09-10T03:16:58Z-
dc.date.available2018-09-10T03:16:58Z-
dc.date.issued2009-10-01en_US
dc.identifier.issn13640321en_US
dc.identifier.other2-s2.0-67650742585en_US
dc.identifier.other10.1016/j.rser.2009.01.023en_US
dc.identifier.urihttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=67650742585&origin=inwarden_US
dc.identifier.urihttp://cmuir.cmu.ac.th/jspui/handle/6653943832/59542-
dc.description.abstractThe investment decision on generation capacity of a wind park is difficult when wind studies or data are neither available nor sufficient to provide adequate information for developing a wind power project. Although new measurement is possible but it is definitely time consuming. To determine the optimum capacity, decision analysis techniques are proposed in this paper to cope with uncertainties arising from wind speed distribution and power-speed characteristics. The wind speed distribution is modeled from the measured data, the Rayleigh distribution, and the Weibull distribution. The power-speed curve of a wind turbine from cut-in speed to rated speed is modeled by using linear, parabolic, cubic, and quadratic characteristics. The optimization model is formulated as a mixed-integer nonlinear programming problem. The constraints are considered as interval bounds so that a set of feasible solutions is obtained. The optimum solution can be determined by using the profit-to-cost and profit-to-area ratios as performance metrics of investment. Decision analysis rules are then applied to overcome the uncertainty problem and to refine the investment plan. The proposed procedure has been tested with the wind power project of the Electricity Generating Authority of Thailand. © 2009 Elsevier Ltd. All rights reserved.en_US
dc.subjectEnergyen_US
dc.titleDecision analysis on generation capacity of a wind parken_US
dc.typeJournalen_US
article.title.sourcetitleRenewable and Sustainable Energy Reviewsen_US
article.volume13en_US
article.stream.affiliationsDepartment of Electrical Maintenanceen_US
article.stream.affiliationsChiang Mai Universityen_US
Appears in Collections:CMUL: Journal Articles

Files in This Item:
There are no files associated with this item.


Items in CMUIR are protected by copyright, with all rights reserved, unless otherwise indicated.