Please use this identifier to cite or link to this item: http://cmuir.cmu.ac.th/jspui/handle/6653943832/60214
Full metadata record
DC FieldValueLanguage
dc.contributor.authorWichai Chattinnawaten_US
dc.date.accessioned2018-09-10T03:39:26Z-
dc.date.available2018-09-10T03:39:26Z-
dc.date.issued2008-12-01en_US
dc.identifier.other2-s2.0-62749197591en_US
dc.identifier.other10.1109/IEEM.2008.4738108en_US
dc.identifier.urihttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=62749197591&origin=inwarden_US
dc.identifier.urihttp://cmuir.cmu.ac.th/jspui/handle/6653943832/60214-
dc.description.abstractThis research aims to re-engineer the process in order to improve both productivity and quality of LC Duplex connector optical fiber production line. This re-engineering process research for fiber optic production process had adopted line balancing, design of assembly line and cellular manufacturing to improve the productivity and quality of the process. Simulation had been used as a mechanism for finding solutions of improvement. The design for assembly line adopts the optimization algorithm of minimizing the maximum between the operation times of each cells and its average. The results showed that the productivity was increased, line balancing efficiency was dramatically improved, and work in-process was reduced as well as the improvement in quality. © 2008 IEEE.en_US
dc.subjectBusiness, Management and Accountingen_US
dc.subjectEngineeringen_US
dc.titleRe-engineering fiber optic production process by simulation, design for assembly lineen_US
dc.typeConference Proceedingen_US
article.title.sourcetitle2008 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2008en_US
article.stream.affiliationsChiang Mai Universityen_US
Appears in Collections:CMUL: Journal Articles

Files in This Item:
There are no files associated with this item.


Items in CMUIR are protected by copyright, with all rights reserved, unless otherwise indicated.